The instrument cross-country rules under 14 CFR §61.65 require a set number of hours of cross-country time as pilot in command, specified hours of instrument time with some under authorized instruction, and one long instrument flight over a 250-nautical-mile route with approaches at three airports using three different kinds of approaches. The long cross-country must be flown under IFR, on a filed flight plan, and logged as a single continuous entry. Most applicants who stumble at the checkride stage do so because of a distance miscalculation or an incomplete logbook entry, not a missing flight.
TL; DR:
- The 250-nautical-mile cross-country flight must be planned with a buffer of 10 to 20 NM to account for headwinds and routing delays, and it requires logged approaches at three airports using three different types of approaches.
- Logbook entries for the long cross-country should document the entire route in one continuous flight with exact date, approaches, and total distance of at least 250 NM, not separate segments.
- Simulator hours can contribute toward the instrument hour requirement but are capped at 10 hours for basic devices and 20 hours for advanced devices, and they cannot replace the actual 250 NM cross-country.
- The 50 NM straight-line rule applies from the original departure airport for logging cross-country time, and flights with multiple landings can be logged as one continuous route if documented properly.
- Most students benefit from structured training programs that integrate route planning, log entries, and multiple approach types, reducing errors during the checkride.
Мазмұны
- What Does §61.65 Actually Require for Cross-Country and Instrument Time?
- How Do You Plan the 250 NM Long Cross-Country Correctly?
- Does the 50 NM Rule Apply the Same Way to Instrument Time?
- How Much Instrument Time Can You Log in a Simulator?
- What Do FAA Interpretations Say About Logging Disputes?
- What’s the Right Order for Flying and Logging the Long Cross-Country?
- Why Precision Approaches and Timing Matter More Than Most Students Expect
- How Flightschoolusa’s Instrument Program Fits These Rules
- Дереккөздер
- FAQ
What Does §61.65 Actually Require for Cross-Country and Instrument Time?
Federal Aviation Regulation §61.65 lays out the aeronautical experience an applicant needs before taking the instrument practical test, and the numbers are precise rather than approximate. Every instrument applicant should be able to recite them the way a captain recites weight and balance limits.
The requirements break down as follows:
- Cross-country time as pilot in command, including some hours in airplanes if pursuing an airplane instrument rating.
- Actual or simulated instrument time, including hours received from an authorized instructor appropriate to the rating.
- One long cross-country flight under IFR along a route totaling at least 250 nautical miles, with an instrument approach at each airport and three different kinds of approaches across the flight.
- Recent instrument experience consisting of instrument training within the two calendar months before the practical test, per the eCFR text of 14 CFR §61.65.
Helicopter and powered-lift applicants operate under a different long cross-country standard: the same section sets that distance at 100 nautical miles rather than 250, so airplane pilots should not assume the numbers transfer across categories. Simulator and flight training device credit toward the 40-hour instrument requirement is capped, and those limits get their own treatment below. The Cornell LII rendering of §61.65 is a useful plain-language cross-check against the eCFR text when you want to confirm a specific clause without wading through legal formatting.
How Do You Plan the 250 NM Long Cross-Country Correctly?
The 250-nautical-mile requirement measures the actual route flown, including any airway or ATC-assigned routing, and must total at least 250 nautical miles, not a straight-line distance.
Three planning elements matter more than any other on this flight:
- Route distance with a buffer. Plan for 260 to 270 NM rather than exactly 250, since headwinds, vectoring, and hold-for-release delays can shave miles off a tight plan.
- An instrument approach at each airport. Every stop on the route needs a logged approach, not just a landing.
- Three different kinds of approaches across the flight. FAA guidance, including commentary tied to the Carty memo, has relaxed the historical reading of “different kinds” so that different lines of minimums on the same RNAV plate, such as an LPV versus an LNAV, can satisfy the requirement as ground-based navigation aids are phased out.
The flight must be conducted under IFR, either in actual instrument conditions or simulated instrument conditions with a CFII or safety pilot aboard, and it must be flown on a filed flight plan. A VFR sightseeing flight with a hood on does not qualify, no matter how much instrument time gets logged along the way.
Pro Кеңес: пайдалану ForeFlight’s route planner to calculate actual routing distance before you file, not the straight-line distance the app shows by default on the map view. The two numbers are rarely the same.
Does the 50 NM Rule Apply the Same Way to Instrument Time?
Cross-country time for instrument purposes follows the same 50-nautical-mile definition used elsewhere in Part 61: a flight that lands at a point more than 50 NM, measured in a straight line, from the original point of departure. An FAA legal interpretation from the Office of Chief Counsel confirms that this measurement runs from the original departure airport, not from any intermediate stop, and that pilots may log a multi-leg trip as a single flight or as discrete segments as long as the total distance requirement is satisfied.
Logging the 250 NM long cross-country correctly means one continuous entry rather than three separate line items for three landings. That entry needs to show:
- The full route, listing each airport in sequence.
- Total route distance of at least 250 NM.
- Actual or simulated instrument time, broken out separately.
- Dual received time if a CFII was aboard, or safety pilot time if flown solo under simulated conditions with a qualified observer.
Safety pilots may log the flight as pilot in command time if they meet the requirements, but a safety pilot does not automatically get to log cross-country time unless they personally meet the 50 NM departure criterion too. Designated Pilot Examiners routinely check whether the “To” field lists every stop and whether approach notations appear at each one, per the FAA legal interpretation on cross-country logging.
How Much Instrument Time Can You Log in a Simulator?
Flight training devices and aviation training devices can carry real weight toward the 40-hour instrument time requirement, but the FAA caps that credit. Basic aviation training devices (AATDs) are generally limited to 10 hours of credit, while advanced AATDs can contribute up to 20 hours, depending on the specific device’s letter of authorization. Part 142 training centers sometimes operate under different approved caps written into their training specifications, so the number on paper at one facility is not universal.
- Sim time can replace a meaningful share of instrument hours, but never the 250 NM long cross-country itself, which must be flown in an actual aircraft.
- Use the simulator to rehearse approach sequencing and hold entries before flying them for real.
- Confirm your specific device’s credit limit with your CFII before counting on it toward your 40-hour total.
What Do FAA Interpretations Say About Logging Disputes?
FAA legal interpretations exist because pilots keep asking the same questions, and the 50 NM measurement generates more of those questions than almost any other clause in Part 61. The Office of Chief Counsel has repeatedly confirmed that distance is measured from the original point of departure, and that a flight with several landings can be logged as one continuous cross-country entry rather than broken into artificial segments, as long as the paperwork shows the full route.
A handful of misconceptions show up again and again in training files:
- Believing a VFR flight with foggles on qualifies as the long instrument cross-country. It does not; the flight must be under IFR.
- Confusing a touch-and-go with the “instrument approach at each airport” requirement, when a full-stop landing or a documented approach to minimums is what the log needs to show.
- Leaving the approach type blank in the remarks column, which forces a DPE to ask the applicant to reconstruct the flight from memory during the oral exam.
One red flag examiners flag often: a long cross-country logged with a route distance suspiciously close to exactly 250 NM and no supporting flight plan or ATC routing to verify how that number was reached.
What’s the Right Order for Flying and Logging the Long Cross-Country?
A qualifying long cross-country comes together in three phases, and skipping the planning phase is where most logging headaches start.
- Preflight: Measure actual route distance using a planning tool like ForeFlight, confirm which approaches are available at each planned airport, file an IFR flight plan, and coordinate with your CFII on how the flight will be logged.
- Ұшу кезінде: Fly each approach as briefed and as it will be logged, execute full-stop landings at airports where that is the plan, and note any ATC-directed routing that adds to or changes your planned distance.
- Postflight: Make one continuous logbook entry covering the full route, mark each approach by type and airport, and separate actual instrument time from simulated instrument time before you close the entry.
Pro Кеңес: Photograph or save your filed flight plan and any ATC routing amendments before you shut down. A DPE who questions your 250 NM total will accept a flight plan printout faster than a verbal explanation of what you remember from three weeks ago.
Why Precision Approaches and Timing Matter More Than Most Students Expect
Training toward the instrument checkride, the flights that stick are the ones where a student flies a precision approach, a nonprecision approach, and a circling approach in the same lesson, then has to explain the difference between them cold. That repetition is what makes the 250 NM long cross-country feel routine instead of stressful. Timing the flight inside the two-month recency window before the practical test, rather than banking it early and letting currency lapse, avoids a scheduling scramble later. Structured Part 141 syllabi and in-house checkride scheduling remove a lot of that friction for students who would otherwise be juggling examiner availability on top of weather.
— Райнер
How Flightschoolusa’s Instrument Program Fits These Rules
Flightschoolusa is built around the same regulatory checkpoints this article just walked through, which matters because a training program that treats the long cross-country as an afterthought tends to produce logbook gaps that surface at the worst possible time, during the checkride oral. The academy’s Instrument Rating Part 141 program structures the 250 NM flight planning, CFII-led instrument instruction, and simulator preparation into a sequence rather than leaving students to assemble it piecemeal.
Checkrides sometimes happen in-house instead of waiting weeks for an outside examiner slot, and instructors may review students’ long cross-country entries against §61.65 before they reach an examiner’s desk. If you are planning your instrument training path and want a program where the logging requirements are built into the syllabus rather than left to chance, look at the full аспаптарды бағалау бойынша оқыту бағдарламасы and get your training timeline started.
Бұл мақала жалпы ақпарат болып табылады, білікті заңгердің кеңесін алмастырмайды. Осы жердегі кез келген әрекетті бастамас бұрын, өз жағдайыңыз туралы білікті заңгермен кеңесіңіз.
Дереккөздер
- eCFR :: 14 CFR 61.65 – Instrument rating requirements. (FAR 61.65)
- 14 CFR § 61.65 — Instrument rating requirements (Cornell LII)
- FAA legal interpretation on cross‑country time and logging
- ForeFlight support: what is required for ForeFlight to recognize a 250 NM cross-country flight
FAQ
What Are the Cross-Country Requirements for an Instrument Rating?
An instrument applicant needs 50 hours of cross-country time as pilot in command and 40 hours of instrument time, including one 250 NM flight under IFR with approaches at three airports using three different kinds of approaches, per 14 CFR §61.65. At least 15 of the 40 instrument hours must come from an authorized instructor.
What Is the 3/6/6/6 IFR Rule?
Pilots commonly use shorthand for instrument currency involving approaches, holding procedures, and intercepting/tracking courses within the preceding calendar months, not the initial certification requirements covered by §61.65. Currency and initial certification are separate standards, and confusing them is a common source of logging errors.
What Counts as Cross-Country for Instrument Purposes?
A flight counts as cross-country when it lands at a point more than 50 nautical miles, measured in a straight line, from the original point of departure. An FAA legal interpretation confirms this distance is measured from the initial departure airport, even across multi-leg flights logged as a single entry.
What Is the Hardest Pilot Certificate to Earn?
Among common ratings, the instrument rating is widely considered the most demanding because it requires precise procedural knowledge, sustained instrument scan skills, and exact logging discipline that examiners scrutinize closely. A Part 141 program with structured CFII instruction and in-house checkride scheduling is built specifically to reduce the friction that makes this rating feel harder than it needs to be.